Sign In | Join Free | My udpf.com |
|
Place of Origin : Guangdong, Mainland China
Brand Name : LF
Certification : ISO9001:2008
Model Number : LF-ZHY0468
MOQ : 100 PCS
Price : Negotiable
Packaging Details : Plastic Tray Or Customized
Delivery Time : MOQ 1 Week, 5000pcs 4 Weeks
Payment Terms : T/T, Western Union, Western Union, MoneyGram, L/C, D/P, D/A
Supply Ability : 30,000pcs Per Month
Application : For Computer, CPU
Overall Dimension : Fins: L80*W31
Aluminum Fin Thickness : 0.4mm
Fin Quantity Per Row : 26 pcs
Part Weight : 330Gram
Tube Quantity : 3pcs
Place of Original : Dongguan, China
Projector High dssipation Aluminum Copper Pipe Heatsink Finned Heat Sink Electronic Heat Sinks
Quick Details:
Precision Copper Pipe Heat SInk
Large Image: Aluminum Fin Heat Sink with Copper Pipe
Materials: Pure Copper C1100 Strips, Purity over 99.5%
Depend on customer's requirements
Description:
Large Image: Aluminum Fin Heat Sink with Copper Pipe
150W Big Power Copper Pipe Heat Sink
Copper Pipe Heat Sink for Projector
Heat Sink With Copper Pipe For Projector
Application: Projector, Computer, Cpu
Specification:
Overall Dimension | Fins: L80*W31 |
Aluminum Fin Thickness | 0.4mm |
Fin Quantity Per Row | 26 pcs |
Aluminum Block Size | 95*60*12mm |
Copper Tube | 8mm in Dia. |
Tube Quantity | 3 pcs |
Part Weight | 330Gram |
Material | Pure Copper C1100 Strips, Purity over 99.5% (Standard: JIS H3250-2006); Pure Aluminum Board A1060 Purity Over 99.6% .(Standard: GB/T3880-2006). (Little Impurity brings very good Electrical and Heat Conduction; Excellent Performance In Corrosion Resistant as well.) |
Copper processing:
Stamping
Automatic Tube Forming Machining
Overflow Welding/Drying Machine
Processing Technic:
1. Copper Fins: Progressive Die Stamping
2. Aluminum Board: Extrusion+ CNC Machining
3. Copper Tube Forming : Automatic Tube Bending+ Burn into Tip Ends.
4. Aluminum Board and Enclosure Nickle Plated, Copper Fin Passivate (Insulation,
Oxidation and Corrosion Resistance).
5. Assembly: Automatic Fin Wearing/Assembly, then Fixed by Overflow Soldering and
Screw/Rivet Combination.
6. Quality Check
7. Packing
Advantages:
1. Professional Research and Design Team, Strong & Automatic Equipments: Progressive Stamping, Automatic Tube Bending Machine, Automatic Fin Wearing Machining
2. Strict Quality Control in Each Process and Finish Product Quality Control
3. Short Delivery Lead Time: 15-30 Days
4. Optional For OEM or ODM
5. Comprehensive After-Sale Service, Quick Responses For Daily Communication
![]() |
Projector High dssipation Aluminum Copper Pipe Heatsink Finned Heat Sink Electronic Heat Sinks Images |